Plastering completed - Front View
Roving Room Roof Fully Completed
Plastering completed - Front View
Roving room roof ready to receive a coat of cement plaster
mesh. The main intention is to keep the aluminium foil taut
and aslo unintentionally act as double heat protection
on top of pvc sun-shading mesh.
and chicken wire mesh in place
either way to enter. Top or bottom.
from entering building. There will be a door in between the wall
Roof structure over roving room completed
At last, the steel roof structure over the roving room and air well has been completed. What is left is to cover up the roof structure. I intend to place a layer of pvc mesh over the roof structure followed by a layer of aluminium and then a layer of chicken wire mesh before a layer of cement plaster is laid on top of it.
At last, the steel roof structure over the roving room and air well has been completed. What is left is to cover up the roof structure. I intend to place a layer of pvc mesh over the roof structure followed by a layer of aluminium and then a layer of chicken wire mesh before a layer of cement plaster is laid on top of it.
Roof structure taking shape.
Roof structure completed. Front View
Work on roof top roving room commence
by water pump at the roof top through pvc pipe with pinholes which will spray out the water into the trench On the 2nd floor the pvc pipe will carry water from above by gravity. The intensity of the spray will be controlled by the water pump that will operate only during the daytime.
pvc pipe above with pinholes at intervals above the trench.
Roof already topped-up