Roof already topped-up

Monday, March 30, 2009


Today, my workers finished topping-up the roof. My next move is to construct the roving room above the void on the roof top. Besides the roving room my workers will also construct the flower trough surrounding the roof and the separation walls for the pools. I will have pools and moat around the roving room. Watch up for these features in my future post.



A layer of BRC laid on aluminium foil



Roof ready to receive concrete



Concreting in progress



Roof finally topped-up with concrete



"Everyone has talent. What is rare is the courage to follow the talent to the dark place where it leads." - Erica Jong



0 comments:

Post a Comment

 

© 2010 Swiftlet Love Design by Dzignine
In Collaboration with Edde Sands • Ping • Lebanese Girls