Showing posts with label kepala. Show all posts
Showing posts with label kepala. Show all posts

Column Stumps in Progress

Tuesday, November 18, 2008
0 comments
After concreting the footings yesterday my workers had started to fix the formworks for the column stumps. The formworks is expected to be in place by tomorrow. My kepala will check the column stumps to make sure they are in alignment with the grids that had been set up as well as at the predetermined level to receive the ground beams . After everything is in order the workers will immediately proceed to concrete the column stumps.

Read more »
 

© 2010 Swiftlet Love Design by Dzignine
In Collaboration with Edde Sands • Ping • Lebanese Girls