My workers had finished concreting all the column stumps today. For column stumps that were concreted on Thursday, the workers had removed the formworks. I will be renting the backhoe again tomorrow to fill up the footings and to level the ground in order to allow the ground beams and ground floor slabs to be constructed.




Read more »
Showing posts with label column stumps. Show all posts
Showing posts with label column stumps. Show all posts
Column Stumps in Progress
Posted by
admin
Tuesday, November 18, 2008
After concreting the footings yesterday my workers had started to fix the formworks for the column stumps. The formworks is expected to be in place by tomorrow. My kepala will check the column stumps to make sure they are in alignment with the grids that had been set up as well as at the predetermined level to receive the ground beams . After everything is in order the workers will immediately proceed to concrete the column stumps.


Read more »
Subscribe to:
Posts (Atom)