Cement board already in place at the roof top.

Friday, March 6, 2009
Today is a weekend in Kuala Terengganu. However, my workers still work today and they have managed to complete fixing the cement board to the roof top. This cement board which is 6mm thick will act as ceiling as well as false work for the roof slab. Above the cement board will be a layer of aluminium foil insulation, a layer of BRC A6 and 2 1/2" thick concrete. Besides working on the roof my workers have also be doing internal plastering for the 2nd Floor wall after having finished the 3rd Floor wall. I have asked my workers to add more lime to the plaster as swiftlets prefer lime to rare cement.

Cement board already fixed to timber roof joists seen from below


"Power is no blessing in itself, except when it is used to protect the innocent." -Jonathan Swift (1667-1745)